A.contract
B.charter party
C.satisfaction
D.agreement
您可能感興趣的試卷
你可能感興趣的試題
A.innage
B.thievage
C.ullage
D.the tank's datum point
A.compartmentalization
B.watertight integrity
C.structural support
D.tank boundaries
A.should be supported at 24 inch intervals with plastic tie wraps
B.should never be located in a tank
C.must be installed in conduit
D.All of the above
A.uncorrected KG
B.maximum allowed KG
C.virtual height of the center of gravity
D.metacentric height
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
最新試題
For the purpose of()tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.
Oil may NOT be transferred unless().
Of the following,the most important consideration for a tanker is().
Each fireman’s outfit and its spare equipment on a tanker must be stowed in a(n)().
ACCIDENTAL ESCAPE OF OIL OUT OF A TANK WHEN IT GETS TOO FULL BECAUSE PUMPING WAS NOT STOPPED IN TIME defines().
Joiner bulkheads on a vessel provide().
Chemical Tankers are generally referred to the cargo ships constructed or adapted and used for the carriage of().
If the Certificate of Inspection of a damaged tank barge has expired,which certificate may be issued to allow its movement to a repair facility? ()
If you are bunkering and you close off one tank in the line of tanks being filled,the rate of flow to other open tanks on the same line will().
Notwithstanding the provisions of this Regulation,the segregated ballast conditions for oil tankers less than 150 meters in length shall be to the()of the Administration.