A.the towboat vibrates when backing down
B.the roostertail exceeds the height of the main deck
C.a strain is placed on the face wires
D.water comes over the foredeck of the lead barges
您可能感興趣的試卷
你可能感興趣的試題
A.main string
B.push string
C.power string
D.face string
A.increase the lifting capacity
B.increase the lifting radius
C.protect the slings
D.protect the upper part of a load
A.to the base of the foremast
B.to the forward-most bitts
C.to the forward part of the deckhouse
D.at the stern
A.The cargo will spontaneously ignite if released to the atmosphere
B.You must operate this barge as a lead barge
C.The barge should be spotted as far away from the towboat as possible
D.The barge must be in a protected position within the tow
A.The cargo block should be tightly packed if the cargo is suitably chilled upon delivery to the vessel
B.Both sides of each crate must be checked for the temperature and the appearance of the fruit
C.The cargo block should be stowed with air channels built throughout the stowed cargo
D.The crates should NEVER be stowed brick fashion
最新試題
Ullages on tankers are measured from().
The()should ensure that the holds in which chemical packages are stowed are properly supervised during the loading operations and these packages are regularly inspected for leakage or damage on the voyage.
In observing rig motion while under tow,the period of roll is the time difference between().
In securing deck loads for an ocean tow,drill pipe should be().
The type of carrier required to file a copy of freight tariffs would be the().
Prior to backloading portable tanks or drums onto an offshore supply vessel,check that each tank is().
It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.
Ullages are measured from().
Air gap is the vertical distance between the bottom of the hull and the().
If reefer spaces are not properly cleaned prior to loading cargo,it will most likely cause().