A.Trip the pump relief valve
B.Order the dock man to shut down
C.Call the owner,operator,or terminal supervisor
D.Run out the vessel's or terminal's fire hose
您可能感興趣的試卷
你可能感興趣的試題
A.leaks in the ship's refrigeration system
B.improper cleaning of the cargo spaces
C.carriage at the wrong temperature
D.improper precooling of the cargo spaces
A.Seal off all tank and compartment ventilation
B.Remove all bulk materials from the P-tanks
C.Provide respiratory protection and monitoring
D.All of the above
A.an above-deck datum such as the top of the ullage pipe
B.the tank ceiling aboard transversely framed vessels
C.the tank top
D.a thievage mark below the edge of the deck
A.the tank ceiling
B.the tank top bushing
C.the thievage mark
D.an above deck datum
A.the base of the expansion trunk
B.the base of the ullage port
C.a line scribed within the ullage port
D.an above-deck datum,usually the top of the ullage hole
最新試題
The type of carrier required to file a copy of freight tariffs would be the().
According to regulations,access to a cargo pumproom in a tanker carrying grades C or D liquid cargo shall be().
The greatest strain,when lifting a load with the jumbo purchase,is on().
In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()
Ullages are measured from().
The pneumatic containers which store bulk dry mud additives and cement on a ship are called().
An oil tanker,except as provided for otherwise,might discharge certain amount at certain rate of oil or oily mixtures into sea when().
It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.
If the cargo gear on your vessel is equipped with a regular guy and a preventer guy,you should().
The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the().