A.steam demand is high
B.salinity is high
C.safety valve simmers
D.burner flame is extinguished
您可能感興趣的試卷
你可能感興趣的試題
A.incorrect electrode setting
B.incorrect nozzle position
C.clogged fuel nozzle
D.broken high tension lead
A.relight the boiler immediately to prevent loss of steam pressure
B.relight the fire off the brickwork as the bricks are cherry red
C.purge the furnace of any combustible gases before attempting to relight the fire
D.speed up the feed pump to prevent dry firing when the burner flame is reestablished
A.in the event of a flame failure
B.in the event of a stack fire
C.when the water level reach the crown sheet
D.when the feed pump discharge pressure drops to a preset minimum
A.a burned out solenoid in the oil supply valve
B.high temperature excess air
C.incorrectly setting the hot-well dump valve
D.an incorrectly positioned burner snubber realy
A.clean the flame scanner photocell window
B.Inspect and clean all solenoid valves
C.lift the safety valves by hand
D.Inspect for oil or water leaks
最新試題
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The treatment of the fuel oils involves storage, heating, filtering and()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Cold weather starting of a diesel engine may be made easier by()
Under MARPOL Code the ship to which it applies has to carry ()
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the following items don’t belong to dock repair works?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()