A.allow an alternate main pump to start in the fully loaded condition thus developing immediate full torque
B.prevent either main pump from being hydraulically motored when idle by cross pressure flow
C.prevent both units from operating simultaneously which could result in doubling the flow of oil and pressure leading to over pressurization of the system
D.all of the above
您可能感興趣的試卷
你可能感興趣的試題
A.are exposed to a vacuum
B.come in contact with extremely hot surfaces
C.are reduced in temperature to just above the pour point
D.become extremely agitated or aerated
A.compensate for major leaks in the system
B.maintain the original fluid viscosity
C.allow for changes in pressure and temperature within the system
D.assure constant fluid temperature
A.ground the board
B.avoid reversing the polarity of the leads
C.isolate sensitive components with heat sinks
D.all of the above
A.vaporize, with the unflashed water remaining at the temperature at which it entered the flash chamber
B.vaporize, with the unflashed water equalizing to the saturation conditions existing in the flash chamber
C.vaporize, with the remaining water at the temperature greater than it entered the flash chamber
D.boil, allowing steam bubbles to rise through the brine at the bottom of the flash chamber
A.The solenoid valves directs high pressure gas to the valve lifting device raising the suction valve off its seat and causing one specific cylinder to become unloaded
B.The solenoid valves directs high pressure gas to the underside of the unloading piston, causing it to rise and allowing the recirculating ports to be opened
C.When the solenoid valve becomes energized, the valve ports become closed, allowing discharge pressure to build up above the piston, shifting it and causing it to unload
D.The solenoid valve allows the refrigerant to pass from the suction chamber to the top of the unloader piston, causing the piston to lift and unload the cylinder
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The ISPS Code consists of a mandatory section-Part A, which shows()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which of the following items don’t belong to dock repair works?()
Under MARPOL Code the ship to which it applies has to carry ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The condensers located in various stages of a flash evaporator are cooled by()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()