A.it difficult for them to finish the job in time
B.difficult for them to finish the job in time
C.they have much difficulty to finish the job in time
D.that difficult for them to finish the job in time
您可能感興趣的試卷
你可能感興趣的試題
A.bunker fuel for use aboard ship
B.lubricating oil for use aboard ship
C.coconut oil carried in tank vessels
D.oily water from a ships bilges
A.stop bleeding
B.open airway
C.mouth-to-mouth respiration
D.call for help
A.station bill
B.clearance papers
C.certificate of inspection
D.permit to proceed
A.14 percent
B.15 percent
C.16 percent
D.17 percent
A.mineral oil
B.machinery oil being transferred for shipboard use
C.crude oil unrefined
D.normal bilge oil and water
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The cetane rating of diesel fuel is an indication of the ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Under MARPOL Code the ship to which it applies has to carry ()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The shipboard oil pollution emergency plan will be invalid after ()