單項選擇題The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.

A.main stem stop valve
B.auxiliary steam stop valve
C.feed check or control valve
D.blow down valve


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題The() is fitted in pair one is the main valve, the other the auxiliary or standby.

A.main stem stop valve
B.auxiliary steam stop valve
C.feed check or control valve
D.blow down valve

2.單項選擇題The() is a smaller valve fitted in the auxiliary steam supply line, and is usually of the non-return type.

A.main stem stop valve
B.auxiliary steam stop valve
C.feed check or control valve
D.blow down valve

3.單項選擇題The()is fitted in the main steam supply line and is usually of the non-return type.

A.main steam stop valve
B.auxiliary steam stop valve
C.feed check or control valve
D.blow down valve

4.單項選擇題The lifting pressure of () is set in the presence of a Surveyor it is locked and cannot be changed.

A.fuel valves of main engine
B.injector pump of main engine
C.safety valves of marine boiler
D.safety valves of a reciprocating pump

5.單項選擇題The propeller is pushed on to the tubeshaft taper and made tight by()

A.a mechanical seal
B.keyway and key
C.a nut
D.shrinkage