A.the chief engineer
B.the master
C.the bridge
D.the company superintendent
您可能感興趣的試卷
你可能感興趣的試題
A.the running hours of the cooling water pump
B.chief engineer’s order
C.the main parameters of main and auxiliary equipment
D.the position of the vessel
A.made and noted as required by the duty engineer
B.reported to chief engineer immediately after being made by duty engineer
C.never made before getting permission from chief engineer
D.made as required but not logged
A.the main propulsion plant
B.lifesaving jackets
C.lifeboat engine
D.state of emergency generator
A.the common ground point
B.the starter’s frame
C.the commutator
D.the starter’s mounting bolts
A.flame retardant
B.moisture resistant
C.oil resistant
D.low conductivity
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
The shipboard oil pollution emergency plan will be invalid after ()
Which of the following items don’t belong to dock repair works?()
Under MARPOL Code the ship to which it applies has to carry ()
To proceed to the assistance of a ship in distress is()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()