A.IOPP
B.type approval certificate
C.cargo ship safety equipment certificate
D.cargo ship safety certificate
您可能感興趣的試卷
你可能感興趣的試題
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.one year
B.two years
C.four years
D.five years
A.one year
B.two years
C.four years
D.five years
A.fire fighting pump
B.the steering gear
C.life boat engine
D.the main engine
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
To proceed to the assistance of a ship in distress is()
The condensers located in various stages of a flash evaporator are cooled by()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Using a file without a handle may result in ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()