單項(xiàng)選擇題During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()

A.excess amount of oily-water mixtures in bilges
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge pumping arrangements
D.paint peering off the uptake


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題During the PSC inspection under the provision of SOLAS 74, which one may be regarded as clear grounds for ships’ detainment?()

A.failure of proper operation of propulsion
B.paint peeling off the uptake
C.no operation procedures for the oil separators
D.damaged sanitary pump

2.單項(xiàng)選擇題Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

A.no operation procedures for the oil separators
B.engine log book missing
C.the master and the chief engineer are unable to communicate effectively
D.absence of an up-date muster list

3.單項(xiàng)選擇題Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book

4.單項(xiàng)選擇題Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

A.absence of engine log book
B.serious corrosion on the hull
C.one page missing in the oil record book
D.paint peeling off some tailings in engine rooms

5.單項(xiàng)選擇題Which one is the ‘clear grounds’ for a more detailed inspection?()

A.paint peeling off the uptake
B.no operation procedures for the oil separators
C.one of ship’s certificates required is invalid
D.damaged sanitary pump

最新試題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:?jiǎn)雾?xiàng)選擇題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:?jiǎn)雾?xiàng)選擇題

“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()

題型:?jiǎn)雾?xiàng)選擇題

During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:?jiǎn)雾?xiàng)選擇題

Cold weather starting of a diesel engine may be made easier by()

題型:?jiǎn)雾?xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:?jiǎn)雾?xiàng)選擇題

Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()

題型:?jiǎn)雾?xiàng)選擇題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()