A.acid
B.sludge
C.mechanical impurity
D.salinity
您可能感興趣的試卷
你可能感興趣的試題
A.too little seal water
B.improper gravity disc
C.oil discharging pump not working very well
D.low water level of the working water
A.100%
B.80%
C.1/2
D.1/3
A.100%
B.1/2
C.1/5
D.1/3
A.seal water supply be cut off
B.make up water supply be cut off
C.oil outlet valve closed or not open sufficiently
D.the flow rate of oily water is too much
A.both as clarifiers
B.first one as clarifiers, second one as purifier
C.both as purifiers
D.first one as purifier, second one as clarifier
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
The shipboard oil pollution emergency plan will be invalid after ()
The condensers located in various stages of a flash evaporator are cooled by()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which of the following items don’t belong to dock repair works?()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
To proceed to the assistance of a ship in distress is()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.