A.connect to the busbar when the load increasing
B.supply power specially to charging panel
C.be put into operation during the ship arriving at or leaving port
D.ensure the power supply to critical equipment after the main switchboard out of power
您可能感興趣的試卷
你可能感興趣的試題
A.Ammeter
B.Voltmeter
C.Wattmeter
D.Synchroscope
A.argo winch
B.Windlass
C.Steering gear
D.Air compressor
A.Emergency fire pump
B.Windlass
C.Main sea water pump
D.Fresh water pump
A.Accommodation lighting
B.Windlass
C.Main sea water pump
D.Compressor
A.Navigation lamp
B.Windlass
C.Main sea water pump
D.Compressor
最新試題
() is not installed on the main switchboar.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the following items don’t belong to dock repair works?()
The cetane rating of diesel fuel is an indication of the ()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()