A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
您可能感興趣的試卷
你可能感興趣的試題
A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator
A.Suez Canal searchlight, air compressor and air conditioning compressor
B.Air compressor, boiler blower and refrigeration plant
C.Boiler blower, Suez Canal searchlight and refrigeration plant
D.Suez canal searchlight, air compressor and boiler blower
A.be switched off by the duty officer
B.be switched on by the duty officer
C.be switched off automatically
D.be switched on automatically
A.connect to the busbar when the load increasing
B.supply power specially to charging panel
C.be put into operation during the ship arriving at or leaving port
D.ensure the power supply to critical equipment after the main switchboard out of power
A.Ammeter
B.Voltmeter
C.Wattmeter
D.Synchroscope
最新試題
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Which of the following items don’t belong to dock repair works?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
() is not installed on the main switchboar.
If separating effect is not good, which measure should be taken ()