A.Megohm meter, insulation light and synchroscope
B.Synchroscope, synchro light and megohm meter
C.Shore power switch, insulation light and synchroscope
D.Megohm meter, insulation light and shore power switch
您可能感興趣的試卷
你可能感興趣的試題
A.Paralleling panel
B.Load panel
C.Emergency generator control pane
D.Main generator control pane
A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel
A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Which of the following items don’t belong to dock repair works?()
() is not installed on the main switchboar.
The ISPS Code consists of a mandatory section-Part A, which shows()
Diesel engine air start system check valves are opened by ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Under MARPOL Code the ship to which it applies has to carry ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()