A.preparation for stand-by should be organized by engine room
B.engine trails should be agreed with bridge, and then do it
C.As to engine trials of the twin diesels and two propellers, the two diesels should use “slow ahead” at the same time
D.After engine trials, the handle of the engine telegraph should be put in the “stop” position
您可能感興趣的試卷
你可能感興趣的試題
A.stand by
B.slow ahead
C.slow astern
D.B or C
A.tachometer and engine telegraph
B.oil and water reserves
C.clock and engine telegraph and test the rudder
D.crews
A.engine room logbook
B.voyage logbook
C.engine room logbook or voyage logbook
D.engine room logbook and voyage logbook
A.Steering gear and windlass
B.Navigation light and radio power panel
C.Navigation device power box
D.Daily fresh water pump
A.Deck machinery
B.Little power load
C.Some important load
D.stationary submersible pump
最新試題
Diesel engine air start system check valves are opened by ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
If separating effect is not good, which measure should be taken ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The shipboard oil pollution emergency plan will be invalid after ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()