A.chief engineer
B.the engineer
C.captain
D.any member of the engine department
您可能感興趣的試卷
你可能感興趣的試題
A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply
A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection
A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment
A.making the repair list, booking spare parts and special tools for the dock repair
B.shutting off all of the SW valves to outboard
C.the sketches or diagrams used for the dock repair
D.cleaning up the oil tank and boiler before enter the dock
最新試題
The treatment of the fuel oils involves storage, heating, filtering and()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which of the following items don’t belong to dock repair works?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Using a file without a handle may result in ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()