A.stays at rest
B.is working stably
C.is worn out
D.is in good operation
您可能感興趣的試卷
你可能感興趣的試題
A.be turned by a turning gear for at least one minute
B.be turned by a turning gear for at least two minutes
C.be turned at least one complete turn
D.be turned at least two complete turns
A.the lubricating pumps are stopped and the access doors are opened
B.the lubricating pumps are running and the access doors are opened
C.the engine is running and the access doors are closed
D.the engine is stopped and the access doors are closed
A.should be kept at a proper level by a cooler
B.should be raised to about 80℃ by a heater
C.should be raised gradually
D.should be lowered to about 60℃
A.operational
B.open
C.closed securely
D.at middle position
A.instigating corrective action
B.indicating values of controlled variables
C.warning of off-limit conditions
D.providing record of performance
最新試題
The main purpose of port State control is not to()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Using a file without a handle may result in ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Under MARPOL Code the ship to which it applies has to carry ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish