A.seal water supply be cut off
B.make up water supply be cut off
C.oil outlet valve closed or not open sufficiently
D.the flow rate of oily water is too much
您可能感興趣的試卷
你可能感興趣的試題
When does auxiliary burner of incinerator put into operation? ()
Ⅰ. start incinerator when it is cold
Ⅱ. the sludge for dealing with is little
Ⅲ. the sludge for dealing with is large
Ⅳ. the water and impurity in sludge are too much
Ⅴ. the temperature in incinerator is low
Ⅵ. dealing with little solid rubbish
A.Ⅰ+Ⅱ+Ⅲ+Ⅴ
B.Ⅰ+Ⅱ+Ⅲ+Ⅳ
C.Ⅰ+Ⅳ+Ⅴ+Ⅵ
D.Ⅰ+Ⅱ+Ⅲ+Ⅵ
A.working at intervals and properly heating
B.warming up to 70℃, increase water supply flow
C.improving impulse of water supply
D.reducing water supply flow
A.MARPOL Annex Ⅲ
B.MARPOL Annex Ⅵ
C.MARPOL Annex Ⅴ
D.MARPOL Annex Ⅳ
A.an International Ship Security Certificate
B.an International Oil Pollution Certificate
C.a Safety Management Certificate
D.an International Ballast Water Management Certificate
A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book
最新試題
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The ISPS Code consists of a mandatory section-Part A, which shows()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
If separating effect is not good, which measure should be taken ()
The cetane rating of diesel fuel is an indication of the ()
Diesel engine air start system check valves are opened by ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
() is not installed on the main switchboar.