A.weather deck
B.orlop deck
C.shelter deck
D.main deck
您可能感興趣的試卷
你可能感興趣的試題
A.tripping line
B.tripping bracket
C.norman pin
D.steamboat ratchet
A.two chains of equal length
B.a single nylon pendant rove through a heavy ring free to move on the pendant
C.two long legs of wire rope shackled to a fishplate
D.a single length of heavy chain with both ends secured on deck to welded pad eyes
A.beach
B.deck
C.pier
D.towed vessel
A.a short length of line used for temporarily holding another line
B.a snatch block for handling a topping lift
C.an engine order telegraph
D.the brake on a cargo winch
A.The rusting area
B.The rusted area
C.The corroded area
D.The corrosive area
最新試題
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
When lowering lifeboats in heavy seas,a good practice is to rig frapping lines().
Which will cause a wire rope to fail().
You are handling a mooring line and are instructed to Check the line.What should you do().
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.
What is TRUE about hoisting operations?()
The minimum length of a boat painter for a lifeboat in ocean service is().
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
The terms ceiling and margin plate are associated with the().