A.lower most continuous deck not broken by water tight bulkheads
B.after most weather deck above the main strength deck
C.upper or weather deck above the main strength deck
D.deck of light construction below the main or strength deck
您可能感興趣的試卷
你可能感興趣的試題
A.deck loads from above
B.dynamic forces while afloat
C.hydrostatic pressure
D.over-pressurization
A.stanchions
B.brackets
C.web frames
D.deck stringers
A.free surface effects are reduced due to pocketing
B.KG is reduced as the vessel seeks the angle of loll
C.effective beam is increased causing BM to increase
D.underwater volume of the hull is increased
A.one barrel
B.two barrels
C.five barrels
D.ten barrels
A.any wire running fore-and-aft on a ship
B.any wire with a fiber core
C.a heavy wire extending from the trunk of the mast to the head of the boom
D.a heavy wire extending from the mast,atwartships to the deck,to support the mast
最新試題
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
To warp a vessel means to().
The Chief Petty Officer employed in the repair and maintenance work shall such abilities as to prepare and apply().
The minimum length of a boat painter for a lifeboat in ocean service is().
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
When lowering lifeboats in heavy seas,a good practice is to rig frapping lines().
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.
The stevedores have already stowed the porcelain ware()up to the deckhead.
What danger is presented if a waterspout passes over a ship?()
The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()