單項(xiàng)選擇題The tweendecker has()below the main deck.

A.another deck
B.two other decks
C.no deck
D.additional deck


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The terms ceiling and margin plate are associated with the().

A.crew's quarters
B.engine room
C.main deck
D.tank top

2.單項(xiàng)選擇題The stevedores have already stowed the porcelain ware()up to the deckhead.

A.loosely
B.closely
C.heavily
D.strongly

3.單項(xiàng)選擇題The process of lowering a boom to a horizontal position and onto its deck support is called().

A.spotting a boom
B.collaring a boom
C.cradling a boom
D.toppling a boom

4.單項(xiàng)選擇題The minimum length of a boat painter for a lifeboat in ocean service is().

A.60 fathoms
B.the distance from the main deck to the light waterline
C.twice the distance from the main deck to the light waterline or 50 feet whichever is greater
D.two times the distance from the boat deck to the light waterline or 50 feet whichever is greater

5.單項(xiàng)選擇題The margin plate is the().

A.outboard strake of plating on each side of an innerbottom
B.outer strake of plating on each side of the main deck of a vessel
C.plate which sits atop the center vertical keel
D.uppermost continuous strake of plating on the shell of a vessel

最新試題

When hoisting a boat on gravity type davits using an electric motor driven winch,the davit arms should be brought up().

題型:?jiǎn)雾?xiàng)選擇題

The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()

題型:?jiǎn)雾?xiàng)選擇題

When a line is spirally coiled about its end and lying flat on deck,it is said to be().

題型:?jiǎn)雾?xiàng)選擇題

Which tackle arrangement has the LEAST mechanical advantage().

題型:?jiǎn)雾?xiàng)選擇題

The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.

題型:?jiǎn)雾?xiàng)選擇題

The terms ceiling and margin plate are associated with the().

題型:?jiǎn)雾?xiàng)選擇題

What term indicates the line drawn at the top of the flat plate keel().

題型:?jiǎn)雾?xiàng)選擇題

The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.

題型:?jiǎn)雾?xiàng)選擇題

Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().

題型:?jiǎn)雾?xiàng)選擇題

What is meant by the term TOPPING THE BOOM?()

題型:?jiǎn)雾?xiàng)選擇題