A.should be coiled in a clockwise direction
B.should be coiled in a counterclockwise direction
C.may be coiled either clockwise or counterclockwise
D.should never be coiled
您可能感興趣的試卷
你可能感興趣的試題
A.the engineers,from a panel in the engine room
B.shutting off the current to the winch
C.pushing the switch lever arm while the winch is running
D.All of the above
A.increasing the shaft RPM prior to release
B.using a pelican hook for quick release
C.using preventers
D.using a short chain for the lead through the stern chock
A.5 times the depth of the water in good holding ground
B.10 times the depth of the water in shallow water
C.2 times the depth of the water in poor holding ground
D.8 times the depth of the water in deep water
A.coil it counterclockwise
B.not coil it
C.take a turn under
D.twist out the kinks under a strain
A.when the line pull reaches the rated winch capacity
B.after the line pull exceeds the rated winch capacity
C.after a short build-up of torque
D.immediately
最新試題
At the instant when a string of casing being run from a ship is landed in the well head,().
The purpose of a devil’s claw is to().
Chafing gear is normally used().
Manila slings should not be used to load().
Limit switches on gravity davits should be tested by().
Extended cyclical variations in tensions will cause an anchor chain to break due to().
After deploying the anchor,a permanent chain chaser is().
Manila lines in which the strands are right-hand laid().
Anchor shackles should have a breaking strength that is().
Neglecting friction,you desire to lift a 300 kgs weight with a stress on the hauling part of 100 kgs.Which of the following tackles would you use?().