A.release
B.relate
C.relieve
D.retain
您可能感興趣的試卷
你可能感興趣的試題
A.take
B.think
C.believe
D.consider
A.what
B.that
C.which
D.who
A.received
B.retrieved
C.relieved
D.resumed
A.in charge of
B.arranged
C.decided to
D.the depth of
A.be the first individual to board the craft
B.drain the hydraulic pressure before lowering the craft
C.have a list of the persons assigned to the lifeboat
D.All of the above
最新試題
Each drilling unit equipped with helicopter fuel storage tanks must have the tanks installed as far as practicable from the().
Each hand portable,semi-portable and fixed fire extinguishing unit on a ship must be tested and inspected at least once every().
Fire protection regulations apply to those towing vessels().
Fire protection regulations for towing vessels allow all of these types of fuel piping,EXCEPT().
Each EPIRB required on a ship shall be stowed in a manner which will permit().
During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?()
During which condition should the operator of a pedestal crane shutdown operations?()
Each fire pump on a tanker must have a pressure gauge located at().
Fire extinguishers used on ship’s are numbered by size I through V,with I being().
During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().