單項(xiàng)選擇題During which condition should the operator of a pedestal crane shutdown operations?()

A.Lightning in the vicinity
B.An approaching squall line
C.A fire on the pier
D.All of the above


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題During which condition should the operator of a pedestal crane shutdown operations?()

A.Lightning
B.High winds
C.Fire aboard
D.All of the above

2.單項(xiàng)選擇題During which condition should the operator of a pedestal crane shutdown operations?()

A.Bunkering barge alongside
B.Potable water spill on deck
C.Crane hydraulic hose bursts
D.Trim greater than 4 feet

3.單項(xiàng)選擇題During which condition should the operator of a pedestal crane shutdown operations?()

A.Bunkering
B.High winds
C.Potable water spill on deck

4.單項(xiàng)選擇題During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().

A.immediately flush the spill with large quantities of fresh water
B.cover the contaminated surface with soda-ash-soaked lime solution
C.add sodium bisulfate on the contaminated surface and spray it down with water
D.move to a position upwind of the spill and allow the product to boil off

5.單項(xiàng)選擇題During the winter months,the southeast trade winds are().

A.stronger than during the summer months
B.weaker than during the summer months
C.drier than during the summer months
D.wetter than during the summer months