A.negative GM
B.propressive flooding
C.structural failure
D.an immediate need to ballast
您可能感興趣的試卷
你可能感興趣的試題
A.structural bulkhead
B.exterior bulkhead
C.certerline bulkhead
D.joiner bulkhead
A.cutting a square notch at each end of the crack
B.drilling a hole at each end of crack
C.slot-welding the crack
D.welding a doubler over the crack
A.manufacturer
B.CCS
C.HAS
D.shipper
A.tree or long awash in a nearly vertical position
B.crew member who refuses to work
C.upstream end of a load wall
D.buoy that is adrift
A.deadrise mark
B.maximum alloable draft mark
C.pilmsoll mark
D.tonnage mark
最新試題
In the Northern hemisphere northerly winds may cause temperature().
()is where the crew eat their meals.
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
The company should establish and maintain procedures to control all documents and date which are relevant to().
It is dangerous for vessels without the operational radar()the estuary.
ECDIS must be able to perform all of the following EXCEPT().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
Full details of all lights and fog signals are shown on().