A.of
B.off
C.to
D.with
您可能感興趣的試卷
你可能感興趣的試題
A.except
B.except that
C.beside
D.except for
A.which hatch will be loaded first
B.will which hatch be loaded first
C.will hatch of which be loaded first
D.first will which hatch be loaded
A.on
B.in
C.at
D.into
A.not touch
B.to not touch
C.not to touch
D.to touch not
A.crude oil washing
B.coming off wreck
C.crew on watch
D.cold of wind
最新試題
Before any loading takes place any signs of the previous cargo should do().
The dew point temperature is().
Full details of all lights and fog signals are shown on().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
When the wave period and the apparent rolling period are the same().
Despite the rising importance and great convenience of the gyrocompass,the magnetic compass still retain its importance because of its().
According to the relevant regulation, lifeboat should be powered by().
The loading of the ship must be done in accordance with().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
A tide is called diurnal when().