A.gross tonnage
B.Suez Canal tonnage's
C.net tonnage's
D.Panama Canal tonnage's
您可能感興趣的試卷
你可能感興趣的試題
A.removed
B.rigged in
C.readjusted
D.tested
A.have to ride
B.have to get
C.have to put
D.have to make
A.just have had
B.just had
C.have just had
D.had just had
A.discharge
B.discharging
C.be discharged
D.to be discharged
A.to overhaul
B.overhauling
C.overhauled
D.overhaul
最新試題
A tide is called diurnal when().
What is a CORRECT reply to a pilot’s request, How’s your heading?()
ECDIS must be able to perform all of the following EXCEPT().
The loading of the ship must be done in accordance with().
()is on the panel of radar.
The helm command PORT TWENTY means().
When the wave period and the apparent rolling period are the same().
Which wind results from a land mass cooling more quickly at night than an adjacent water area?()
According to the relevant regulation, lifeboat should be powered by().
Which of the following is not an operation mode of AIS?()