A.cutting the straps that enclose the container
B.removing the rubber sealing strip from the container
C.loosening the turnbuckle on the securing strap
D.pushing the button on the hydrostatic release
您可能感興趣的試卷
你可能感興趣的試題
A.only when the load is taken off the cable
B.only when there is a load on the cable
C.only when activated by the controls at the lowering station
D.at any time
A.sufficient oxygen in a compartment to support life
B.combustible gases present
C.hydrogen gases present
D.All of the above
A.danger
B.dangerous
C.dangerously
D.dangering
A.meet
B.face
C.be in front of
D.follow
A.breaking the weak link
B.releasing the tie-down strap
C.pulling the operating cord
D.releasing the CO2 canister
最新試題
The helm command PORT TWENTY means().
ECDIS must be able to perform all of the following EXCEPT().
()is on the panel of radar.
The loading of the ship must be done in accordance with().
In the Northern hemisphere northerly winds may cause temperature().
Which of the following is not an operation mode of AIS?()
The circulation around a low pressure center in the Northern Hemisphere is().
()is where the crew eat their meals.
Which of the following shall not the officers in charge of the navigational watch do?()
What is it called when it is possible to ignite the vapour above the oil?()