A.a boat bucket
B.an air tank filled with water
C.an oar and canvas weighted down
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.Carbon dioxide
B.Dry chemical
C.Foam
D.All of the above
A.fairlead
B.heaving line
C.stay
D.warp
A.the floating-free method only
B.breaking the weak link on the painter
C.throwing the entire container overboard and then pulling an the operating
D.removing the securing straps
A.pulling a cord
B.cutting the wire restraining bands
C.removing the rudder packing strip
D.throwing the entire container overboard
A.The sea anchor deploys
B.The floor inflates
C.If upside down, the craft rights itself
D.The painter detaches from the raft
最新試題
The dew point temperature is().
The ISM code is part of().
The company should establish and maintain procedures to control all documents and date which are relevant to().
It is dangerous for vessels without the operational radar()the estuary.
According to the relevant regulation, lifeboat should be powered by().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
Which of the following is not a form of precipitation?()
Which of the following is not an operation mode of AIS?()
Manoeuvring information can not be obtained from().
What is a CORRECT reply to a pilot’s request, How’s your heading?()