A.in
B.by
C.with
D.from
您可能感興趣的試卷
你可能感興趣的試題
A.stand-on vessel
B.privileged vessel
C.burdened vessel
D.hampered vessel
A.do
B.take
C.set
D.have
A.increase ship's speed
B.slow down ship's speed
C.make up ship's speed
D.fix up shp's speed
A.to avoid the rearrangement of the cargo loaded on board
B.to ensure the safety of the ship and cargo
C.to reject the damaged cargo during loading operation
D.to prevent the spontaneous combustion of the coal and grain
A.experience from practice
B.various types of cargoes
C.different types of ships
D.personal abilities
最新試題
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Before any loading takes place any signs of the previous cargo should do().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
According to the relevant regulation, lifeboat should be powered by().
The mean draft of a ship is the draft().
Which of the following is not a form of precipitation?()
Full details of all lights and fog signals are shown on().
Bales close to the deckhead should be covered to prevent().
It is dangerous for vessels without the operational radar()the estuary.