單項(xiàng)選擇題Before inserting a new switch in the network, the network administrator checks that the VTP domain name is correct, the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks, erases existing VLANs, and connects the switch to the network. Following that procedure, there is no connectivity in the network. What is a possible cause of this problem? ()

A. Because the configuration revision of the new switches is lower than the rest of the network,it can change the VLAN database of the other switches.
B. As a VTP server, the new switch deleted all VLANs of the network.
C. Erasing VLANs increases the VTP configuration revision.
D. Since the configuration revision of the network is higher than the new switch,the VLAN database was automatically synchronized.


您可能感興趣的試卷

你可能感興趣的試題

1.多項(xiàng)選擇題

Refer to the exhibit. Users from the Engineering VLAN complain that every time Business VLAN users have a network connectivity issue, the Engineering VLAN users usually have problems experiencing slow response or network connectivity problems. After troubleshooting, an unauthorized switch 2 was found. This unauthorized switch has been a regular problem, assuming the root bridge function under the spanning-tree domain and causing the 
Engineering VLAN to be unstable. Which three of these actions could be suggested to fix the problem?()

A. Upgrade Spanning Tree Protocol to Rapid Spanning Tree Protocol.
B. Change Business VLAN PCs to switch 1 and switch 4.
C. Force the root bridge to be switch 2, instead.
D. Adjust spanning-tree timers (max-age and forward-delay).
E. Shut down all unused ports.
F. Use MSTP to separate the Engineering VLAN from the Business VLAN to optimize spanning-tree convergence time within each VLAN

2.單項(xiàng)選擇題What is true about IP Source Guard with port security?()

A.Binding should be manually configured.
B.It is not supported if IEEE 802.1x port-based authentication is enabled.
C.The DHCP server must support option 82, or the client is not assigned an IP address.
D.It filters based on source IP address only.

3.單項(xiàng)選擇題

Refer to exhibits 1 and 2. In exhibit 1, all users on the LAN segment use router A as the active HSRP router. Router B is the standby router for the HSRP. In exhibit 2, the network management team reported that there is no utilization on the WAN link B. To solve this problem, you decide to change the logical topology of your LAN, but you are not sure about what changes must be made. You must manage HSRP or change it to another protocol in order to provide the most scalable design, automatic redundancy, and load balancing. Which one of these actions would be the best choice? ()

A. Use MHSRP, with three users using router A as the default gateway and three users using router B as the default gateway.
B. Keep HSRP and activate PBR to redirect half of the traffic to the other WAN link.
C. Use the backup interface on the WAN link B to provide load balancing for all users.
D. Use GLBP instead, because it provides you with up to three MAC addresses for the same default gateway virtual IP address.
E. Use GLBP instead, because it provides you with up to four MAC addresses for the same default gateway virtual IP address.

5.多項(xiàng)選擇題

Refer to the exhibit. The Layer 2 network uses VTP to manage its VLAN database. A network designer created all VLANs on the VTP server (switch 1) and it has been advertised through VTP to all other VTP clients (switches 2 through 4). Due to network growth, a network operator decided to add a new switch between switch 1 and switch 3. The network operator has been instructed to use a refurbished switch and use a VTP client. Which three of these factors should the network operator consider to minimize the impact of adding a new switch?()

A. Pay special attention to the VTP revision number, because the higher value takes the priority.
B. Configure all VLANs manually on the new switch in order to avoid connectivity issues.
C. A trunk should be established between the new switch and switches 1 and 3 as VTP only runs over trunk links.
D. Set at least the VTP domain name and password to get the new switch synchronized.
E. An ISL trunk should be established between the new switch and switches 1 and 3, because VTP only runs over ISL.
F. Pay special attention to the VTP revision number, because the lower value takes the priority.

最新試題

Which protocol and port have been assigned by IANA for RADIUS authentication?()

題型:?jiǎn)雾?xiàng)選擇題

Which two of these are used in the selection of a root bridge in a network utilizing Spanning Tree ProtocolIEEE 802.1 D?()

題型:多項(xiàng)選擇題

All of these are fundamental building blocks of differentiated services Traffic Conditioner Block exceptwhich one?()

題型:?jiǎn)雾?xiàng)選擇題

What is also called Type 0 authentication in OSPF on Cisco Routers?()

題型:?jiǎn)雾?xiàng)選擇題

In Layer 2 topologies, spanning-tree failures can cause loops in the network. These unblocked loops cancause network failures because of excessive traffic. Which two Catalyst 6500 features can be used to limitexcessive traffic during spanning-tree loop conditions?()

題型:多項(xiàng)選擇題

Which two EIGRP options will limit a query domain?()

題型:多項(xiàng)選擇題

Which of these best describes the actions taken when a VTP message is received on a switch configuredwith the VTP mode "transparent"?()

題型:?jiǎn)雾?xiàng)選擇題

Which two statements are true about RED?()

題型:多項(xiàng)選擇題

Which of these statements about penultimate hop popping are true?()

題型:多項(xiàng)選擇題

You are the network administrator of an enterprise with a main site and multiple remote sites. Your networkcarries both VOIP and data traffic. You agree with your service provider to classify VOIP and data trafficaccording to the different service RFCs. How can your data and VOIP traffic be marked?()

題型:?jiǎn)雾?xiàng)選擇題