A. Make HSRP track interfaces between the edge and core routers.
B. Replace HSRP with GLBP. 用GLBP替換HSRP
C. Add crossed intrasite links: R1-R4, R2-R3, R5-R8, and R6-R7.
D. Make R3 and R8 have lower HSRP priority than R1 and R7.
E. Replace HSRP with VRRP
您可能感興趣的試卷
你可能感興趣的試題
A.root guard
B.loop guard
C.BPDU guard
D.UDLD
E.BPDU skew detection
A. Because Frame Relay IETF encapsulation is only configurable at interface level, you must use IETF encapsulation on all routers.
B. This is not a possible scenario. A dedicated Frame Relay link to RemoteB is mandatory at the central office.
C. The router at RemoteB must be replaced by a Cisco router.
D. Use Frame Relay IETF encapsulation on a per-VC basis on the central office router.
E. There is a problem in the Frame Relay cloud, because Cisco routers are compatible with IETF Frame Relay.
A.ip verify unicast source reachable-via any
B.ip verify unicast reverse-path
C.ip verify unicast reverse-path loose
D.ip verify unicast reverse-path strict
A. Because the configuration revision of the new switches is lower than the rest of the network,it can change the VLAN database of the other switches.
B. As a VTP server, the new switch deleted all VLANs of the network.
C. Erasing VLANs increases the VTP configuration revision.
D. Since the configuration revision of the network is higher than the new switch,the VLAN database was automatically synchronized.
Refer to the exhibit. Users from the Engineering VLAN complain that every time Business VLAN users have a network connectivity issue, the Engineering VLAN users usually have problems experiencing slow response or network connectivity problems. After troubleshooting, an unauthorized switch 2 was found. This unauthorized switch has been a regular problem, assuming the root bridge function under the spanning-tree domain and causing the
Engineering VLAN to be unstable. Which three of these actions could be suggested to fix the problem?()
A. Upgrade Spanning Tree Protocol to Rapid Spanning Tree Protocol.
B. Change Business VLAN PCs to switch 1 and switch 4.
C. Force the root bridge to be switch 2, instead.
D. Adjust spanning-tree timers (max-age and forward-delay).
E. Shut down all unused ports.
F. Use MSTP to separate the Engineering VLAN from the Business VLAN to optimize spanning-tree convergence time within each VLAN
最新試題
In PIM-SM what control plane signaling must a multicast source perform before it begins to send multicasttraffic to a group?()
Which two of these are used in the selection of a root bridge in a network utilizing Spanning Tree ProtocolIEEE 802.1 D?()
Which of these statements about penultimate hop popping are true?()
Which two statements about SA caching are true?()
On the basis of the network provided in the exhibit, all routers are configured to run EIGRP on all links. If the link between PG-R1 and PG-R2 fails, what is the maximum number of queries PG-R3 will receive for 192.168.1.0/24, assuming that all the packets sent during convergence are transmitted once (there are no dropped or retransmitted packets)?()
Which of these best describes the actions taken when a VTP message is received on a switch configuredwith the VTP mode "transparent"?()
How does an IPv6 router deal with a packet that is larger than the outgoing interface MTU?()
Which message type is constructed and sent from an MSDP router to its MSDP peers when it receives a PIM register message knowing that the MSDP router is also configured as an RP for the PIM domain?()
In Layer 2 topologies, spanning-tree failures can cause loops in the network. These unblocked loops cancause network failures because of excessive traffic. Which two Catalyst 6500 features can be used to limitexcessive traffic during spanning-tree loop conditions?()
All of these are fundamental building blocks of differentiated services Traffic Conditioner Block exceptwhich one?()