A.Enable VTP pruning on any switch in the management domain
B.Enable VTP pruning on any client switch in the domain
C.Enable VTP pruning on a VTP server in the management domain
D.Enable VTP pruning on every switch in the domain
E.None of the other alternatives apply
您可能感興趣的試卷
你可能感興趣的試題
A.VTP version 2 supports Token Ring VLANs
B.VTP version 2 allows VLAN consistency checks
C.VTP version 2 allows active redundant links when used with spanning tree
D.VTP version 2 reduces the amount of configuration necessary
E.VTP version 2 saves VLAN configuration memory
A.VTP mode
B.VTP password
C.VTP revision number
D.VTP pruning
E.VTP domain name
F.None of the other alternatives apply
Refer to the exhibit. VTP has been enabled on the trunk links between all switches within the TEST domain. An administrator has recently enabled VTP pruning. Port 1 on Switch 1 and port 2 on Switch 4 are assigned to VLAN 2. A broadcast is sent from the host connected to Switch 1. Where will the broadcast propagate?()
A.Every switch in the network receives the broadcast and will forward it out all ports.
B.Every switch in the network receives the broadcast,but only Switch 4 will forward it out port 2.
C.Switches 1,2,and 4 will receive the broadcast,but only Switch 4 will forward it out port 2.
D.Only Switch 4 will receive the broadcast and will forward it out port 2.
A.30 seconds
B.5 minutes
C.1 minute
D.10 seconds
E.5 seconds
F.None of the other alternatives apply
A.A root VTP server
B.A trunk port
C.VTP priority
D.VLAN 1
E.None of the other alternatives apply
最新試題
Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()
During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()
DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()
What must be the same to make multiple switches part of the same Multiple Spanning Tree (MST)?()
Refer to the exhibit and the partial configuration of switch SW_A and SW_B. STP is configured on all switches in the network. SW_B receives this error message on the console port:00:06:34: %CDP-4-DUPLEX_MISMATCH: duplex mismatch discovered on FastEthernet0/5 (not half duplex), with SW_A FastEthernet0/4 (half duplex) , with TBA05071417(Cat6K-B) 0/4 (half duplex). What would be the possible outcome of the problem?()
Refer to the exhibit. LACP has been configured on Switch1 as shown. Which is the correct command set to configure LACP on Switch2?()
Refer to the exhibit. STP has been implemented in the network. Switch SW_A is the root switch for the default VLAN. To reduce the broadcast domain, the network administrator decides to split users on the network into VLAN 2 and VLAN 10. The administrator issues the command spanning-tree vlan 2 root primary on switch SW_A. What will happen as a result of this change?()
Refer to the exhibit. Switch 15 is configured as the root switch for VLAN 10 but not for VLAN 20. If the STP configuration is correct, what will be true about Switch 15?()
How are STP timers and state transitions affected when a topology change occurs in an STP environment?()
Which statement is correct about RSTP port roles?()