ISL is being configured on a Company switch.
Which of the following choices are true regarding the ISL protocol? ()
A. It can be used between Cisco and non-Cisco switch devices.
B. It calculates a new CRC field on top of the existing CRC field.
C. It adds 4 bytes of protocol-specific information to the original Ethernet frame.
D. It adds 30 bytes of protocol-specific information to the original Ethernet frame.
您可能感興趣的試卷
你可能感興趣的試題
Which of the following trunking modes are unable to request their ports to convert their links into trunk links? ()
A. Negotiate
B. Designate
C. No negotiate
D. Auto
E. Manual
F. Off
If you were to set up a VLAN trunk over a Fast Ethernet link on switch R1,
which trunk mode would you set the local port to on R1 if you wanted it to respond to requests from its link partner (R2) and become a trunk? ()
A. Auto
B. Negotiate
C. Designate
D. No negotiate
You are the network administrator at Company and switch R1 is configured as shown below: Interface gigethernet 0/1 Switchport mode trunk
Switchport trunk encapsulation dot1q Switchport trunk native vlan 5
If untagged frames are arriving on interface gigethernet 0/1 of R1,
which of the following statement are correct?()
A. Untagged frames are automatically assumed to be in VLAN 5.
B. Untagged frames are defaulted to VLAN 1 traffic.
C. Untagged frames are dropped because all packets are tagged when dot1q trunked.
D. Untagged frames are determined on the other switch
E. Untagged frames are not supported on 802.1Q trunks.
If you were to configure an ISL Ethernet trunk between two Cisco switches, named R1 and R2,
what would you have to include at the end of the link for the trunk to operate correctly? ()
A. An identical VTP mode.
B. An identical speed/duplex.
C. An identical trunk negotiation parameter.
D. An identical trunk encapsulation parameter.
Which of the following technologies would an Internet Service Provider use to support overlapping customer VLAN ID’s over transparent LAN services? ()
A. 802.1q tunneling
B. ATM
C. SDH
D. IP Over Optical Networking
E. ISL
最新試題
If G1/0/1 on DS1 is shutdown, what will be the current priority value of the Vlan105’s group on DS1 ?()
Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()
Which three statements about STP timers are true?()
Refer to the exhibit. STP has been implemented in the network. Switch SW_A is the root switch for the default VLAN. To reduce the broadcast domain, the network administrator decides to split users on the network into VLAN 2 and VLAN 10. The administrator issues the command spanning-tree vlan 2 root primary on switch SW_A. What will happen as a result of this change?()
Refer to the exhibit. The command switchport mode access is issued on interface FastEthernet0/13 on switch CAT1. What will be the result?()
Refer to the exhibit and the partial configuration of switch SW_A and SW_B. STP is configured on all switches in the network. SW_B receives this error message on the console port:00:06:34: %CDP-4-DUPLEX_MISMATCH: duplex mismatch discovered on FastEthernet0/5 (not half duplex), with SW_A FastEthernet0/4 (half duplex) , with TBA05071417(Cat6K-B) 0/4 (half duplex). What would be the possible outcome of the problem?()
DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()
What will occur when a nonedge switch port that is configured for Rapid Spanning Tree does not receive a BPDU from its neighbor for three consecutive hello time intervals?()
Refer to the exhibit. Which statement is true about the output?()
Refer to the exhibit. Based on the output of the show spanning-tree command, which statement is true? ()