單項(xiàng)選擇題When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題

You are planning a new VLAN-based network solution. 
What is one item you should consider when creating your implementation plan as it concerns VLANs?()

A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and  configured
C.administrator assignments
D.rollback plan

2.單項(xiàng)選擇題What network information do you need when you plan to implement a VLAN-based solution?()

A.default VLAN information for all unused switch ports
B.802.1x configuration parameters 
C.number of IP subnets needed
D.IP routing protocol information

4.單項(xiàng)選擇題Which Cisco IOS command globally enables port-based authentication on a switch? ()

A.aaa port-auth enable
B.radius port-control enable
C.dot1x system-auth-control
D.switchport aaa-control enable

5.單項(xiàng)選擇題What does the interface subcommand switchport voice vlan 222 indicate?()

A.The port is configured for both data and voice traffic.
B.The port is fully dedicated to forwarding voice traffic.
C.The port will operate as an FXS telephony port.
D.Voice traffic will be redirected to VLAN 222.

最新試題

During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()

題型:?jiǎn)雾?xiàng)選擇題

During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group. What can be done to make the group function properly ? ()

題型:?jiǎn)雾?xiàng)選擇題

Which two statements are true about BPDU port-guard and BPDU filtering?()

題型:多項(xiàng)選擇題

What must be the same to make multiple switches part of the same Multiple Spanning Tree (MST)?()

題型:?jiǎn)雾?xiàng)選擇題

What is the configured priority value of the Vlan105’s group on DS2 ?()

題型:?jiǎn)雾?xiàng)選擇題

DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()

題型:?jiǎn)雾?xiàng)選擇題

How are STP timers and state transitions affected when a topology change occurs in an STP environment?()

題型:?jiǎn)雾?xiàng)選擇題

Which option correctly identifies the Cisco IOS switching methods in descending order from the fastest method to the slowest method?()

題型:?jiǎn)雾?xiàng)選擇題

Refer to the exhibit and the partial configuration of switch SW_A and SW_B. STP is configured on all switches in the network. SW_B receives this error message on the console port:00:06:34: %CDP-4-DUPLEX_MISMATCH: duplex mismatch discovered on FastEthernet0/5 (not half  duplex), with SW_A FastEthernet0/4 (half duplex) , with TBA05071417(Cat6K-B) 0/4 (half duplex). What would be the possible outcome of the problem?()

題型:?jiǎn)雾?xiàng)選擇題

Which three statements are true of the Link Aggregation Control Protocol (LACP)?()

題型:多項(xiàng)選擇題