A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
您可能感興趣的試卷
你可能感興趣的試題
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
最新試題
I saw the cargo surveyor()the cargo on deck just a minute ago.
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
Let’s submit the case() the cargo surveyor.
The end of the joint with the exterior threads is called the().
The annual survey for endorsement of a Load Line Certificate must be held within().
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
At()an occasional survey has been carried out.
Connecting elements of a mooring system should be fabricated from().
The burden of proving unseaworthiness is upon those who()it.
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().