單項(xiàng)選擇題Prior to getting underway,the Master or person in charge of a vessel must().

A.conduct a fire drill
B.conduct a boat drill
C.log the fore and aft draft marks
D.test the emergency generator


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Which statement concerning the carriage of containers is TRUE?().

A.The Chief Mate and Master of a container ship should have the proposed stowage plan ready for the stevedore upon arrival in port
B.When stowed on deck of a break bulk ship,the bottom of the container must be evenly supported throughout
C.With tiered containers,a 40-foot container may be stowed on top of two 20-foot containers
D.Deck load calculations must take into account the square footage of the entire container bottom

2.單項(xiàng)選擇題The Chief Mate must ascertain that the deck loads are stowed in such a manner as().

A.not to affect the draught trim
B.not to affect the cargo ventilation
C.not to affect the free surface
D.not to affect the vessel's stability