單項選擇題The first requirement for logical troubleshooting of any system is the ability to ().

A.collect all available data on a casualty
B.recognize normal operation
C.identify the probable cause of a symptom
D.isolate the faulty component


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題An electrical device which employs a stationary armature and a rotating electromagnetic field is used aboard ship as a ().

A.magnetic amplifier
B.ship’s service alternator
C.three-wire DC generator
D.saturable core reactor

2.單項選擇題As a general rule, the first troubleshooting action to be taken in checking faulty electric control devices is to ().

A.draw a one line diagram of the circuitry
B.test all fuses and measure the line voltage
C.take megger readings
D.insulate the apparatus from ground

3.單項選擇題A circuit breaker differs from a fuse in that a circuit breaker ().

A.melts and must be replaced
B.is enclosed in a tube of insulating material with metal ferrules at each end
C.gives no visual indication of having opened the circuit
D.trips to break the circuit and may be reset

4.單項選擇題Voltage generated by most AC generators is fed from the machine to the bus by means of().

A.brushes on a commutator
B.brushes on slip rings
C.slip rings on a commutator
D.direct connections from the stator

5.單項選擇題Electrical leads and insulation on a motor should be painted with().

A.heat-resisting acrylic
B.heat-resisting aluminum
C.insulating varnish
D.insulating white lead