A.the circuit being worked on and the location of all switches and circuit breakers controlling it
B.first-aid techniques for treating electrical shock
C.cardiopulmonary resuscitation (CPR)
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.week
B.2 weeks
C.month
D.3 months
A.De-energize the applicable switchboard bus
B.Bypass the interlocks
C.Secure and tag the supply circuit breaker in the open position
D.Station a man at the circuit supply switch
A.Wear rubber gloves and boots
B.Use only approved non-conducting tools
C.Ground the case of the machine before beginning any repairs
D.Open the supply circuits and tag the switches
A.electromagnetic field, revolving armature type
B.electromagnetic field, oscillatory armature type
C.armature, oscillatory electromagnet field type
D.armature, rotating electromagnetic field type
A.The breaker should be closed when one synchronizing lamp is dark and the other is bright
B.The breaker should be closed when both synchronizing lamps are bright
C.The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus
D.A portable phase sequence indicator must be used to verify the information from the lamps
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Which of the following items don’t belong to dock repair works?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The condensers located in various stages of a flash evaporator are cooled by()
If separating effect is not good, which measure should be taken ()
The cetane rating of diesel fuel is an indication of the ()
The shipboard oil pollution emergency plan will be invalid after ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.