A.sounding the tank
B.waiting for the vessel to list
C.examining tank boundaries
D.checking fuel oil strainers
您可能感興趣的試卷
你可能感興趣的試題
A.on the outgoing tide
B.overboard after dark
C.overboard through an oily water separator
D.anytime in an emergency, i-emain engine lube oil failure
A.drained into the vessels bilges
B.reclaimed for other uses
C.held in a slop tank
D.purified and then reused
A.when the remaining charge volume is less than 90 percent of the required VOLUME
B.at each inspection for certification
C.at each annual inspection
D.when the weight loss exceeds 10% of weight of charge
A.welding brackets across both ends of the crack
B.chipping out and slot welding the entire crack
C.drilling a hole at each end of the crack
D.cutting a square notch at each end of the crack
A.breaking the fire chemical chain reaction
B.smothering
C.cooling
D.isolating the heat from the fuel
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
() is not installed on the main switchboar.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
To proceed to the assistance of a ship in distress is()