A.leaked into navigable waters
B.poured into navigable waters
C.pumped into navigable waters through a fixed piping system
D.all of the above
您可能感興趣的試卷
你可能感興趣的試題
A.a damaged pneumercator line
B.a puncture, crack, or hole in the skin of the vessel
C.improper record keeping of fuel transfer activities
D.contamination of the contaminated steam supply system
A.it exceeds 3 years from date of issue
B.an alteration approved by the Captain of the Port is made
C.an intermediate survey has not be conducted within 12 months from the date that the IOPP was issued
D.the vessel is transferred to the flag of another country
A.Cargo tank ballast
B.Segregated ballast
C.Engine room bilges
D.Cargo pump room bilges
A.explosimeter
B.oxygen indicator
C.fresh air indicator
D.all of the above
A.concentrations of explosive gas
B.an oxygen deficiency in a space
C.the presence of harmful amounts of carbon monoxide
D.All of the above
最新試題
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
If separating effect is not good, which measure should be taken ()
The shipboard oil pollution emergency plan will be invalid after ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()