A.the bridge watch-keeper
B.the captain
C.the chief engineer
D.the engine room staff
您可能感興趣的試卷
你可能感興趣的試題
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry
A.port state control
B.flag state control
C.fire and boat drill
D.Safety inspection
A.additional
B.permanent
C.temporary
D.long
A.detergent
B.de-oiling
C.defrosting
D.demulsifying
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The treatment of the fuel oils involves storage, heating, filtering and()
The condensers located in various stages of a flash evaporator are cooled by()
The cetane rating of diesel fuel is an indication of the ()
The shipboard oil pollution emergency plan will be invalid after ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Cold weather starting of a diesel engine may be made easier by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish