A.The watch keeping personnel
B.The chief engineer
C.The person on a bunker barge
D.The duty deck officer
您可能感興趣的試卷
你可能感興趣的試題
A.available minimum requirements
B.available maximum requirements
C.mandatory minimum requirements
D.mandatory maximum requirements
A.the bridge watch-keeper
B.the captain
C.the chief engineer
D.the engine room staff
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry
A.port state control
B.flag state control
C.fire and boat drill
D.Safety inspection
最新試題
The condensers located in various stages of a flash evaporator are cooled by()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The cetane rating of diesel fuel is an indication of the ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Cold weather starting of a diesel engine may be made easier by()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The main purpose of port State control is not to()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()