單項選擇題

When deciding the composition of the engineering watch, which may include appropriately qualified ratings, following criteria shall be taken into account()
Ⅰ.the type of ship
Ⅱ.the type and condition of the machinery
Ⅲ.the safety of life, ship, cargo and port
Ⅳ.the observance of international, national and local regulations

A.Ⅰ+Ⅱ
B.Ⅱ+Ⅲ
C.Ⅱ+Ⅲ+Ⅳ
D.Ⅰ+Ⅱ+Ⅲ+Ⅳ


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題When deciding the composition of the engineering watch, which may include appropriately, many factors shall be taken into account().

A.satisfied engineers
B.qualified ratings
C.satisfied chief engineer
D.qualified chief engineer

2.單項選擇題STCW78/95 states that the office in charge of the engineering watch is the representative ().

A.ship-owner’s
B.master’s
C.chief engineer’s
D.manager’s

4.單項選擇題Is considered to be one of the detainable deficiencies under the STCW Convention().

A.Absence, substantial deterioration or failure of proper operation of the cargo deck area fire protection on tanker
B.Absence, non-compliance or serious deterioration of lights, shapes or sound signal
C.Absence or failure of proper operation of the radio equipment for distress and safety communication
D.Absence in a watch of a person qualified to operate equipment essential to safe navigation, safety radio communications or the prevention of marine pollution

5.單項選擇題All of the followings are the detainable deficiencies under the SOLAS Convention expert().

A.Failure of proper operation of propulsion and other essential machinery, as well as electrical installation
B.Failure of the proper operation of the main and auxiliary steering gear
C.Failure of engineering watch arrangements to confirm to the requirements specified for the ship by Administration
D.Failure of the proper operation of emergency generator, lighting, batteries and switches