A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
您可能感興趣的試卷
你可能感興趣的試題
A.Security level 1
B.Security level 2
C.Security level 3
D.Highest safety level
A.Security level 1
B.Security level 2
C.Security level 3
D.Medium safe level
A.Security level 1
B.Security level 2
C.Security level 3
D.Lowest safety level
A.BRC
B.MCC
C.AUT-0
D.AUT-1
A.BRC
B.MCC
C.AUT-0
D.AUT-1
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The treatment of the fuel oils involves storage, heating, filtering and()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()