A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
您可能感興趣的試卷
你可能感興趣的試題
A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
A.Security level 1
B.Security level 2
C.Security level 3
D.Highest safety level
A.Security level 1
B.Security level 2
C.Security level 3
D.Medium safe level
A.Security level 1
B.Security level 2
C.Security level 3
D.Lowest safety level
A.BRC
B.MCC
C.AUT-0
D.AUT-1
最新試題
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The condensers located in various stages of a flash evaporator are cooled by()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Under MARPOL Code the ship to which it applies has to carry ()
The main purpose of port State control is not to()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
To proceed to the assistance of a ship in distress is()