A.bunker at a normal rate
B.check for kinks in hose
C.close valves slowly
D.shut valves before topping off
您可能感興趣的試卷
你可能感興趣的試題
A.lining up the systems
B.topping off
C.starting delivery
D.connecting hoses and joints
A.draft of the vessel
B.rate of delivery
C.communication with terminal personnel
D.observation of manifold valves
A.be safe if mixed with fresh water
B.prevent seasickness
C.promote urine excretion
D.protect against heat cramps
A.survivors in the water
B.food and water
C.land
D.bad weather
A.12 to 15 times per minute
B.18 to 20 times per minute
C.20 to 25 times per minute
D.as fast as possible
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The main purpose of port State control is not to()
Under MARPOL Code the ship to which it applies has to carry ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
If separating effect is not good, which measure should be taken ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
The cetane rating of diesel fuel is an indication of the ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The condensers located in various stages of a flash evaporator are cooled by()