A.moisture in the compressed air supply
B.excessive dryness in the compressed air supply
C.pressure surging in the compressed air receiver
D.insufficient lubrication of the system components
您可能感興趣的試卷
你可能感興趣的試題
A.reset action
B.proportional action
C.two position action
D.rate action
A.command input
B.set point signal
C.output
D.feedback
A.set point
B.control point
C.deviation
D.offset
A.controlled variable
B.manipulated variable
C.set point
D.control point
A.dead band
B.control point
C.deviation
D.offset
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If separating effect is not good, which measure should be taken ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The treatment of the fuel oils involves storage, heating, filtering and()