A.voyage repairs
B.routine docking
C.damage repairs
D.conversion
您可能感興趣的試卷
你可能感興趣的試題
A.informative note
B.invoice
C.store booklet
D.maintenance book
A.informative note
B.consignment note
C.store booklet
D.maintenance book
A.the chief engineer
B.the second engineer
C.the third engineer
D.the fourth engineer
A.engine logbook
B.delivery docket
C.store list
D.maintenance book
A.the manager
B.your agent
C.the PSCO
D.the master
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
() is not installed on the main switchboar.
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The condensers located in various stages of a flash evaporator are cooled by()
The cetane rating of diesel fuel is an indication of the ()
The shipboard oil pollution emergency plan will be invalid after ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.