單項選擇題According to the regulation of the voyage trial on new ship,()is one of the trial items of the UMS ship bridge control.

A.starting and direction changing trial
B.cancelling accelerating function trial
C.lowest stable speed trial
D.continuous running trial


您可能感興趣的試卷

你可能感興趣的試題

2.單項選擇題During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()

A.chief engineer
B.the engineer
C.captain
D.any member of the engine department

3.單項選擇題When the vessel entering the dock, the first work that engineer should contact with the shipyard ()

A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply

4.單項選擇題When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()

A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power

5.單項選擇題During the deck repair,() should be measured firstly before tail shaft is drawn out.

A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection